We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction period and method.
ipros is IPROS GMS ・ IPROS One of the largest technical database sites in Japan that collects information on.

Construction period and method - List of Manufacturers, Suppliers, Companies and Products | IPROS GMS

Construction period and method Product List

1~2 item / All 2 items

Displayed results

"Are you only considering redoing and repainting?" A method with overwhelmingly short construction time.

Short construction period! No damage to the floor! No interruption to operations! Available 24/7 throughout Japan.

"I replaced it six months ago. If I had known about this method earlier." This is a voice from our customers that we hear at exhibitions and other events. 【What is the Teratech Method?】 Unlike traditional methods of replacement or resurfacing, this method restores floor slopes, subsidence, and unevenness to a level surface without breaking the floor and without stopping operations. It is a patented method that injects Teratech resin beneath concrete floors (roads) to fill voids under the floor with its expanding force, bringing the sunken floor back to level. Since it uses injection holes smaller than a one-yen coin (6mm) to inject expanding resin without breaking the floor, there is no need to remove goods or machinery. This means there are no additional costs for moving items, temporary storage during construction, or disposal of industrial waste, aside from the construction costs. 【Main Features】 1: Can be constructed without stopping operations 2: Short construction period (150 to 200 square meters in about 8 hours) 3: No need to move goods, racks, or machinery since the floor is not broken 4: Normal use is possible immediately after construction For more details, please view the catalog from the "PDF Download" section. Feel free to contact us by phone (0120-873-835) or email (info@mainmark.co.jp).

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

コンクリート床沈下修正|施工後10分でリフト走行可能な短工期工法

操業停止のリスクを回避したい現場に!コンクリート打ち替え不要でコストを削減。最短1日の急速施工でライン稼働への影響を抑えます

RCIジャッキー工法・RCI工法は、工場のコンクリート床沈下で起きる段差や機械の傾きを防ぐ地盤補強・床沈下修正工法です。 「打ち替え工事のせいで何週間もラインが止まる…」そんな現場に向けて、油圧ジャッキアップと薬液注入技術で、操業を維持したまま数ミリ単位の床レベル復旧を実現します。 【こんな困りごとにおススメ】 ◆床の段差のせいでリフトの荷崩れが頻繁に起きる ◆ラインを長期間止める打ち替え工事なんてできない ◆過去に空洞を薬液で埋めたが、また沈下して傾いた <選ばれる理由> ・施工後10〜30分でリフト走行可能な超速硬化 ・既存床を壊さず小径削孔だけで直すため撤去不要 ・円柱状支持体を作り基礎から支えて再沈下を防止 ※詳しくはPDFをダウンロードしていただくか、お気軽にお問い合わせください。

  • Other contract services
  • Construction period and method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration